CorvidWeb platform
Freight planning for operators.
Depot Filter SlowPlanning deskSwitching depots on the run list takes about twelve seconds on our Hamburg depot, which has roughly 400 active runs. The smaller depots are instant.Dmitri Novak Twelve seconds against instant on a smaller depot points at something that grows with the number of runs rather than at the network. Profiling it against a copy of your Hamburg data.Ferry Legs IgnoredPlanning deskAny route with a ferry crossing is costed as if the lorry drove it. Dover to Calais comes back as ninety minutes of driving, so the whole day's plan is wrong from that point on. We run four crossings a week.Dmitri Novak Four crossings a week means this is not an edge case for you, it is Tuesday. Reproduced immediately with Dover to Calais.Optimiser Times OutOperationsPast roughly 60 stops it spins for two minutes and returns a 504. We plan a 90-stop run every Monday, so we're doing it in halves and stitching them together, which is worse than not optimising at all.Dmitri Novak That threshold is exactly what we needed. Reproduced at 64 stops here.